Skip to main content

Lines and prices

In short​

Four kinds of lines: a work (ouvrage) from your library, a free line, a section title, a comment. The totals are recalculated at every change.

Adding lines​

  • From the library: a panel opens on your works, favorites first, with the filters All, Favourites and Personal. The + button adds the work to the quote; you can add several in a row, then close with Done. The label, the description, the price and the VAT (TVA) rate come along with the work. The price is the one the library shows: supply cost
    • margin on supplies + installation time × hourly rate (see The works library); you can then change it on the line without touching the work.
  • Free line: you type everything yourself.
  • Section: a title to group lines ("Panel", "Lighting"), with no amount.
  • Comment: a line of text for your customer, with no amount.

Quantities, prices, discounts​

Each line has a quantity, a unit price excluding VAT, a VAT rate and, if you want, a discount in percent. The line total updates straight away.

The global discount is entered in the summary, at the bottom of the quote, in % or in €, then Apply. It is applied after the line discounts and spread over each VAT rate, so the amounts stay right.

Reordering lines​

With a mouse, drag the line. On a phone, use the Move the line up and Move the line down buttons.

The summary​

At the bottom of the quote: the total excluding VAT, the global discount if there is one, the VAT detailed by rate, and the total including VAT.

Checkpoints​

Some lines show "Checkpoints: …". These are the points of the NF C 15-100 standard (the French electrical installation standard) that this work will add to your site checklist, once the quote is signed. You have nothing to do. See On site.